Topping Road

Bakery Recipes and Topping

topping slab

topping slab
I will pour 1 1 / 2 "concrete slab at the same location without any difference?

i have an existing concrete slab and I'll pour. 1 1 / 2 set "the top of it, or will be. Fracture.

Problem might be to set the foundation was not sound and. / Or not be based on well. You may want to have some scars. In your mix if you plan to do. We have old cars for sale before. 1 / 2 "of concrete to cover the cracks. And uneveness. We found it after a few years. Layer of cement on a record-off. Leave us in places and pot holes. Visit the cracks here and there in the drive.

Brokk 330 breaks a 8 inch slab with double mat rebar

Share and Enjoy:
  • Print
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Mixx
  • Google Bookmarks
  • Blogplay

Tags: , , , , , , ,

This entry was posted on Wednesday, December 5th, 2007 at 9:50 am and is filed under topping. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

Leave a Reply





XHTML: You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>